Service of Nissan Almera from 1995 to 2000 in N15 body
1. General information
2. General requirements to car repairs
3. Operation and maintenance of the car
4. Petrol engines
4.1. Removal and installation of the power unit
4.1.1. Removal of the power unit
4.1.2. Installation of the power unit
4.1.3. Removal, a detachment and installation of the power unit on cars with the automatic transmission
4.2. Dismantling and assembly of the engine
4.3. Block of cylinders
4.4. Conrod and piston group
4.5. Bent shaft and flywheel
4.6. Gas distribution mechanism
4.7. Head of the block of cylinders of GA14DE and GA16DE engines
4.8. Head of the block of cylinders of the SR20DE engine
4.9. Cooling system
4.10. Lubrication system
4.11. System of production of the fulfilled gases
4.12. Power supply system
4.13. Complex Control System of the Engine (CCSE)
5. Diesel engines
6. Transmission
7. Running gear
8. Steering
9. Brake system
10. Electric equipment
11. Body
12. Appendices
13. Schemes of electric equipment
 





7f435ca2


4-1-2-ustanovka-silovogo-agregata.html

4.1.2. Installation of the power unit

Preparation for installation. Before installation of the transmission with the engine apply a layer of jellied lubricant on vents of a main shaft of the transmission. Be convinced of the correct installation of pins on the engine or the transmission and that the bearing supporting a main shaft of the transmission is in a flywheel groove. Center the provision of the conducted clutch plate by means of a special mandrel. Carefully pull the transmission over the engine before entry of adjusting pins into the nests. Establish the bolts connecting a transmission case to the engine; be convinced of the correct provision of all arms and tighten bolts the set moment. Establish a starter and tighten fastening bolts.
For installation of the power unit place it under the car and a zastropita for lifting eyes. Together with the assistant bring the power unit the lifting device to a motor compartment. Check whether interfere with installation auxiliary units, pipelines and electric wires.
Installation of the power unit is carried out in the sequence, the return to removal, taking into account the following instructions.
Make sure that electric wires are correctly laid and fixed by brackets, and electrosockets correctly and are reliably connected.
Before installation of shaft of the drive of forward wheels replace cuffs on flanges of semi-axial gear wheels of differential.
Check correctness of connection of branch pipes of the cooling system and their reliable fastening by collars.
Adjust a cable of the drive of management of a butterfly valve.
Replace new all самоконтрящиеся nuts.
Tighten threaded connections the set moment.
Replace lock rings on shafts of shaft of the drive of wheels.
Establish distance of 55 mm between two bolts of a rubber-metal support of a forward arm of a suspension bracket of the power unit before start an inhaling of fastening of arms of a suspension bracket.
Connect and adjust a coupling cable.
Establish and adjust auxiliary driving belts.
Fill in oil of the required brand in the engine and the transmission.
Fill the cooling system with antifreeze and remove from it air.
Launch the engine and check lack of leak of liquids.
After assembly check and if necessary adjust the angles of installation of forward wheels.

"previous page
4.1.1. Removal of the power unit
following page"
4.1.3. Removal, a detachment and installation of the power unit on cars with the automatic transmission