Service of Nissan Almera from 1995 to 2000 in N15 body
1. General information
2. General requirements to car repairs
3. Operation and maintenance of the car
4. Petrol engines
5. Diesel engines
5.1. General information
5.2. Block of cylinders and krivoshipnoshatunny mechanism
5.3. Gas distribution mechanism
5.4. Cooling system
5.4.1. Design features
5.4.2. Removal and installation of a belt of the drive of the water pump
5.4.3. Removal and installation of the water pump
5.4.4. Replacement of cooling liquid and removal of air from the engine cooling system
5.5. Lubrication system
5.6. Power supply system
5.7. Control system of the CD20 engine
5.8. Control system of the CD20E engine
5.9. System of production of the fulfilled gases
6. Transmission
7. Running gear
8. Steering
9. Brake system
10. Electric equipment
11. Body
12. Appendices
13. Schemes of electric equipment
 





7f435ca2


5-4-2-snyatie-i-ustanovka-remnya-privoda-vodyanogo-nasosa.html

5.4.2. Removal and installation of a belt of the drive of the water pump


Fig. 3.23. Placement of the screw of adjustment of a tension of a belt of the drive of the water pump


Establish a forward part of the car on a support, remove on the right side a wheel, an antisplash mudguard and the right guard of a case of the engine. Weaken the top bolt of fastening of the pump of the hydraulic booster of steering. Then, unscrewing the adjusting screw, weaken a tension of a driving belt (fig. 3.23). Take off a belt of the drive of the water pump.

Fig. 3.24. Belts of the drive of the service equipment: 1 — a pulley of a bent shaft;
2 — a pulley of the pump of the hydraulic booster of steering; 3 — a pulley of the water pump; 4 — a generator pulley; 5 — a conditioner compressor pulley;
6 — a tension roller


Before installation of a belt check a condition of each pulley. Establish a belt as it is specified fig. 3.24, paying attention to laying it in streams of all pulleys.
Adjust the screw a tension of a driving belt so that the deflection when pressing the middle of a branch between pulleys of the water pump and pump of the hydraulic booster of steering by effort of 98 N made for a new belt 3 —
4 mm, for the earned extra belt of 5 — 7 mm.
Tighten the top bolt of fastening of the pump of the hydraulic booster of steering. Execute the remained operations as it should be, the return to removal.

"previous page
5.4.1. Design features
following page"
5.4.3. Removal and installation of the water pump