Service of Nissan Almera from 1995 to 2000 in N15 body
1. General information
2. General requirements to car repairs
3. Operation and maintenance of the car
4. Petrol engines
4.1. Removal and installation of the power unit
4.2. Dismantling and assembly of the engine
4.3. Block of cylinders
4.4. Conrod and piston group
4.5. Bent shaft and flywheel
4.5.1. Check of technical condition
4.5.2. Check of gaps between inserts and necks of a bent shaft
4.5.3. Check of an axial gap of a bent shaft
4.6. Gas distribution mechanism
4.7. Head of the block of cylinders of GA14DE and GA16DE engines
4.8. Head of the block of cylinders of the SR20DE engine
4.9. Cooling system
4.10. Lubrication system
4.11. System of production of the fulfilled gases
4.12. Power supply system
4.13. Complex Control System of the Engine (CCSE)
5. Diesel engines
6. Transmission
7. Running gear
8. Steering
9. Brake system
10. Electric equipment
11. Body
12. Appendices
13. Schemes of electric equipment
 





7f435ca2


4-5-3-proverka-osevogo-zazora-kolenchatogo-vala.html

4.5.3. Check of an axial gap of a bent shaft

Establish persistent half rings in nests of an average support so that flutes for lubricant were turned towards a bent shaft, install inserts of bearings in the block of cylinders. Grease and enclose a bent shaft in bearings. Establish to the place of a cover of bearings with inserts. Shooters on covers have to be directed towards the drive of camshafts. Tighten the set moment new bolts of fastening of covers. Install the indicator so that his leg rested against an end face of a bent shaft. Shifting by means of the lever a bent shaft in the axial direction, determine its movement by the indicator. If movement does not correspond to the recommended size, replace persistent half rings.


"previous page
4.5.2. Check of gaps between inserts and necks of a bent shaft
following page"
4.6. Gas distribution mechanism