Service of Nissan Almera from 1995 to 2000 in N15 body
1. General information
2. General requirements to car repairs
3. Operation and maintenance of the car
4. Petrol engines
4.1. Removal and installation of the power unit
4.2. Dismantling and assembly of the engine
4.3. Block of cylinders
4.4. Conrod and piston group
4.5. Bent shaft and flywheel
4.6. Gas distribution mechanism
4.7. Head of the block of cylinders of GA14DE and GA16DE engines
4.8. Head of the block of cylinders of the SR20DE engine
4.9. Cooling system
4.10. Lubrication system
4.10.1. Removal, check and installation of the oil pump
4.10.2. Check of pressure of oil
4.10.3. Removal and installation of the oil heater of the SR20DE engine
4.10.4. Removal and installation of the oil pallet of the SR20DE engine
4.11. System of production of the fulfilled gases
4.12. Power supply system
4.13. Complex Control System of the Engine (CCSE)
5. Diesel engines
6. Transmission
7. Running gear
8. Steering
9. Brake system
10. Electric equipment
11. Body
12. Appendices
13. Schemes of electric equipment
 





7f435ca2


4-10-2-proverka-davleniya-masla.html

4.10.2. Check of pressure of oil

Instead of pressure sensor through transitional the union connect the control manometer. On the engine which is warmed up up to the working temperature pressure of oil (kPa) has to conform to the following requirements:
for GA engines:
in the mode of idling       59
with a frequency of rotation of a bent shaft of 2000 min. —        1 245
with a frequency of rotation of a bent shaft of 6000 min. —       1 422
for the SR20DE engine:
in the mode of idling       78
with a frequency of rotation of a bent shaft of 3000 min. —       1 450
with a frequency of rotation of a bent shaft of 6000 min. —       1 422

"previous page
4.10.1. Removal, check and installation of the oil pump
following page"
4.10.3. Removal and installation of the oil heater of the SR20DE engine